Brochure page featuring Cheray Polymer, a pipeline anti-corrosion and reinforcement solutions provider, with a photo of a modern building with flags in the background.
A webpage showcasing a range of protection and repair products for field joints, direct-drill protection, factory-coating repair, and viscoelastic protection for pipelines and related components.
Website page about field-joint coating systems featuring a photo of workers inspecting a large coated steel pipe at a construction site.
Four different technical pipeline components with descriptions: 1) A black pipeline section for directional drilling, 2) A black cylindrical piece for offshore and submarine joints, 3) A large black pipeline with a shiny surface for ultra-low ambient installation, 4) A cutaway illustration of a pipeline with fitting components for bends, fittings, and repairs.
A webpage with information about localized repair systems for PE and PP coatings, including images of repair patches, melting sticks, and descriptions of repair materials such as mastic sealant filler and adhesive tape.
A webpage for system selection in project planning, featuring a list of application routes such as EPE field joints, high-temperature PP field joints, offshore joints, water and gas networks, ultra-low ambient installation, directional drilling, and bends, fittings & coating repair. The right section shows criteria for final system confirmation including factory coating, operating temperature, installation environment, surface preparation, and required standards.
A project requirements page with a dark blue section showing a black cylindrical device and six informational boxes outlining project inputs, including dimensions, coating, temperature, environment, standards, and schedule.